150 kV switching station
The activities mainly consisted on:
Civil:
- Engineering (conversion of a traditional design to a prefab design);
- Pile driving;
- In-situ pouring of floors;
- Supply and assembly of prefab elements;
- Finishing (plumbing, low voltage installation, computer floors).