Effluent Treatment Plant
The activities mainly consisted on:
The activities mainly consisted on:
Civil:
- 1,800 m2 sheet piling
- Headhunting from 738 piles
- 790 m1 underground GRE pipes
- 430 m1 underground GRE fire extinguishing pipes
- 145 m1 sewage
- pulling 67 km of cable
- 3,100 m2 vacuum testing
- 9,500 m3 building concrete
- 2,389 tons of reinforcing steel
- 1,550 m2 tank insulation
- 6.500 m2 coating
- 3,370 m2 concrete pavement
- 5,800 m2 asphalt roads
- Renovation of existing substation incl. HVAC installations