Civil works for the extension of the existing factory.

PTA extension

The activities mainly consisted on:

The activities mainly consisted on:

Civil:

  • 406 Fundex piles, length 7-15 m
  • 37 Tubex posts, length 5.5 m1
  • 2114 m3 of concrete foundation slabs
  • 1600 m3 of concrete foundations and extensions
  • 150 m3 of prefab concrete columns, beams and floors
  • 460 tons of reinforcing steel
  • 1345 m1 earth