SDA Project
The activities mainly consisted off:
The activities mainly consisted off:
Civil:
- The activities consisted of: Pile driving (700 Vibro piles)-
- Pile driving (285 Fundex piles)
- Concrete slabs and foundations (cast on site)
- Concrete columns and beams (cast on site)
- Concrete columns and beams (precast)
- Concrete wells and retention basins
- Concrete pavement
- Laying underground cables (cable pulling)
- Sewage (HDPE and carbon steel)
- Terrain finishing
- Design & Construct of the Auxiliary Room (FAR building)
- Architectural Services
- Construction of a RoRo berth.
Contractor = Fluorine / Jacobs