Realisatie van alle civiele, architectonische werken en realisatie van de technische installatiegebouwen

TenneT Land station Borssele

The activities mainly consisted on:

Civil;

  • Pile driving (772 Vibro piles);
  • Concrete slabs and foundations (in situ);
  • Concrete walls (precast);
  • Grounding systems;
  • Technical installation building;
  • Finishing the site, stone roads and fencing;

E&I

  • Electrical and HVAC installations;