Neste Oil - New sustainable fuel production facility

Neste Oil - New sustainable fuel production facility

New sustainable fuel production facility

The activities mainly consisted of:

Multi-disciplinairy works, Civil, Mechnical/piping and E&I, for the realization of the expansion of the existing plant RJF (Renewable Jet Fuel) and the new WWT plant (Waste Water Treatment)

Civil works 

RJF plant (Brownfield)

  • Ground works
  • Concrete works 19,500 m3
  • Foundations for pipe racks, structures and equipment
  • Manholes (sewers and cable pulling wells)
  • Concrete pavements
  • Paving and terrain finishing

Mechanical works

  • Prefabrication and installation of underground piping and tie-ins, 3,300 mtrs (in total)

WWT plant (Greenfield)

  • Architectural works
  • Ground works
  • Concrete works
  • Foundations for pipe racks, steel structures and equipment, six tank foundations, 11 basins, 5 buildings, manholes (sewers and cable pulling wells)
  • Paving and terrain finishing
  • Construction of five buildings (substation 8, substation 11, Guardhouse, 10kV Grid station, expansion Laboratory)

Mechanical works

  • Installation of underground piping and tie-ins, 3,300 mtrs (in total)

E&I works for buildings, installations of:

  • Lighting systems
  • Fire & Gas detector systems
  • Earthing works
  • Telecom & security systems
  • HVAC down flow units
  • 2 x chiller unit each with 175 kW cooling capacity
  • VRF system

 

 

  • 0.5 million ton upgrade production SAF per annum in Rotterdam
  • 2.7 million tons of renewable products annually in Rotterdam
  • 80 % reduction greenhouse gas emissions